ENBRIDGE T-SOUTH EXPANSION

Type of project
Dynamic Barriers
Year
2022
Location
SAVONA - BRITISH COLUMBIA - Canada
Client
ENBRIDGE PIPELINES INC.

Challenge

WSP Canada was the prime consultant on a natural gas compression station expansion project for Enbridge Pipelines Inc., located in Savona, which is 38 Kms west of Kamloops, BC. According to Geotechnical assessment done by BGC Engineering Inc. (hired by Enbridge), a steep uphill slope was present along the south edge of the site. Loose rocks from the slope could be a hazard to the compression station located at the bottom of the slope. WSP was working on 2 possible options to protect the site from any potential rockfall hazard. One was a gravity retaining wall (gabion) and the second was a rockfall catchment fence.

Solution

Maccaferri Canada was asked to provide preliminary design and cost estimates for a gravity retaining wall and a rockfall catchment fence. After reviewing the geotechnical assessment provided by BGC and a thorough site visit, Maccaferri proposed a 2000 KJ barrier. This barrier was 175 linear meter and 4 meter high.

Download
the Success Story

ENBRIDGE T-SOUTH EXPANSION

Download
ENBRIDGE T-SOUTH EXPANSION

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *