BRIDGE AT FT136/079/14 AT KULIM, KEDAH
Challenge
The abutment of a bridge at Kuala Ketil, has been under heavy scouring over the years due to high velocity water flow. Further scouring would affect the structural integrity of bridge piers and expose the pilecaps. Reno Mattress has been proposed as a surface erosion control to protect the abutment.
Solution
A layer of Reno Mattress with Polimac coating was installed on the abutment and riverbank surface. During high tide and heavy runoff seasons, the reno mattress provides a surface stabilisation control on the installed area.
Our products for
this Success Story
Get in touch with us
[contactForm_txtSuccessSubmit]