WEBER RIVER BRIDGE REPLACEMENT, RB1000 ROCKFALL BARRIER

Year
2025
Location
Interstate 84, Weber River Canyon, Utah
Client
Utah Department of Transportation
Designer
Utah DOT

Challenge

With aging infrastructure comes re-designs and upgrades. Frequently upgraded bridges require slight alingnment changes to accommodate increased traffic patterns, and to keep the interstate open during construction. The Weber River Bridge Replacement Project required an extremely busy, constricted interstate/railroad corridor to be kept operational during construction. In order to accomplish this, a hillside was cut and retained with a soil nail wall, on top of this new wall a Maccaferri RB1000 dynamic rockfall barrier was needed to protect traffic and workers for the duration of the project.

Solution

At nearly 960 linear feet, the area requiring protection needed continuous protection which called for multiple barrier alingnments. Each alingnment shared an end post with the adjacent barrier which saves resources, simplifies drilling, and ultimately provides continuous rockfall protection.

Our products for
this Success Story

Get in touch with us

If you agree with the company's Privacy Policy and understood its content, the Data Controller asks you if you consent to the processing in manner provided in the company's privacy policy for sending promotional communications of the services / activities provided by the Data Controller. *

Furthermore, the Data Controller asks you if you give your consent for the communication of your personal data to the Maccaferri Affiliates, and the consequent extra-EU transfer that may result, for their own purposes, including of a promotional nature (sending marketing communications) *