{"id":83815,"date":"2024-06-19T09:47:58","date_gmt":"2024-06-19T07:47:58","guid":{"rendered":"https:\/\/www.maccaferri.com\/id\/?p=83815"},"modified":"2024-06-19T09:48:04","modified_gmt":"2024-06-19T07:48:04","slug":"application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2","status":"publish","type":"post","link":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/","title":{"rendered":"Application of MSE Wall with Back-to-Back System for Construction of Access Road at Bener Dam"},"content":{"rendered":"<div class=\"wp-block-mac-container-block box-container\"><div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\"><div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\"><p>Bener Dam is a dam project built in Purworejo Regency, Central Java Province, Indonesia. This dam is one of several national strategic projects that aim to improve irrigation, control floods, and have a storage capacity large enough to meet raw water needs in the area.<\/p>\n\n<p>At Bener Dam, an access road will be built connecting the main dam and quarry. This road will transport material from the quarry to the main dam. Without this access road, backfilling at the main dam cannot be carried out. The construction of this access road involves a filling process and requires a retaining wall filled with soil. Initially, this retaining wall was planned to use concrete, but another solution was needed that was safer and more cost-effective.<\/p>\n\n<p>To overcome this problem, the MSE Wall solution with a back-to-back system is applied to the access road which has a length of around 150 meters with height variations between 8 and 20 meters. The selection of this system is based on the special characteristics of the access road which does not have slopes along its route. This lack of slope means there is no natural barrier on either side of the road, which would normally help hold back soil. Therefore, a solution is needed that can provide maximum stability.<\/p>\n\n<p>The back-to-back structure on the MSE Wall is designed to support embankment from both sides equally, allowing the desired elevation to be achieved without the risk of landslides or land shifts. Thus, the MSE Wall can withstand large ground pressure and provide long-term stability.<\/p>\n\n<p>Apart from that, this solution also allows construction to be carried out faster and easier compared to conventional methods. Installation of the MSE Wall does not require the use of intensive heavy equipment, thereby reducing operational costs and speeding up processing time. By considering safety factors, cost efficiency, and construction speed, MSE Wall with a back-to-back system is the right choice for the construction of an access road for the Bener Dam project.<\/p>\n\n<p>Maccaferri Indonesia provides comprehensive services, beginning with the design and planning stage, offering technical recommendations, manufacturing and supplying materials, and assisting during the construction phase with a Product Assistant. Most of the materials from Maccaferri Indonesia are manufactured locally in Indonesia according to International and National Standardization and have <a href=\"http:\/\/tkdn.kemenperin.go.id\/search.php?where=perush&amp;what=maccaferri&amp;utm_source=gerejabengkongnews&amp;utm_medium=digital&amp;utm_campaign=tkdn\">TKDN<\/a> certificates.<\/p>\n\n<p>Our commitment to environmental preservation is reflected in the registration of our products in the <a href=\"https:\/\/www.maccaferri.com\/epd\/?utm_source=gerejabengkongnews&amp;utm_medium=digital&amp;utm_campaign=epd\">Environmental Product Declaration<\/a>, nurturing the world for future generations.<\/p>\n\n<p><a href=\"https:\/\/www.maccaferri.com\/id\/hubungi-kami\/\">We are readily available to address any questions or concerns you may have<\/a>.<\/p><\/div><\/div><\/div><div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>","protected":false},"excerpt":{"rendered":"<p>The Bener Dam in Purworejo, Central Java, is a strategic project to improve irrigation, control floods, and provide raw water. Construction of access roads using back-to-back MSE Wall solutions is an innovative step to ensure land stability and cost efficiency. This solution enables fast and safe construction without relying on conventional concrete, optimizing the long-term success of the project.<\/p>\n","protected":false},"author":10872,"featured_media":83824,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_joinchat":[],"footnotes":""},"categories":[1],"tags":[],"class_list":["post-83815","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.0 (Yoast SEO v27.0) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Application of MSE Wall with Back-to-Back System for Construction of Access Road at Bener Dam<\/title>\n<meta name=\"description\" content=\"Bener Dam in Purworejo, Central Java, is a strategic project for irrigation, flood control, and raw water. Construction of access roads using back-to-back MSE Wall solutions for stability and cost efficiency.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Application of MSE Wall with Back-to-Back System for Construction of Access Road at Bener Dam\" \/>\n<meta property=\"og:description\" content=\"Bener Dam in Purworejo, Central Java, is a strategic project for irrigation, flood control, and raw water. Construction of access roads using back-to-back MSE Wall solutions for stability and cost efficiency.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Maccaferri Indonesia\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-19T07:47:58+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-06-19T07:48:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2024\/06\/bener-dam-banner-1024x355.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"355\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Yulia Novrina\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Yulia Novrina\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/\"},\"author\":{\"name\":\"Yulia Novrina\",\"@id\":\"https:\/\/www.maccaferri.com\/id\/#\/schema\/person\/1d5e5211ed9f95f96dead42ad7a8265a\"},\"headline\":\"Application of MSE Wall with Back-to-Back System for Construction of Access Road at Bener Dam\",\"datePublished\":\"2024-06-19T07:47:58+00:00\",\"dateModified\":\"2024-06-19T07:48:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/\"},\"wordCount\":430,\"publisher\":{\"@id\":\"https:\/\/www.maccaferri.com\/id\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2024\/06\/bener-dam-banner.png\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/\",\"url\":\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/\",\"name\":\"Application of MSE Wall with Back-to-Back System for Construction of Access Road at Bener Dam\",\"isPartOf\":{\"@id\":\"https:\/\/www.maccaferri.com\/id\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2024\/06\/bener-dam-banner.png\",\"datePublished\":\"2024-06-19T07:47:58+00:00\",\"dateModified\":\"2024-06-19T07:48:04+00:00\",\"description\":\"Bener Dam in Purworejo, Central Java, is a strategic project for irrigation, flood control, and raw water. Construction of access roads using back-to-back MSE Wall solutions for stability and cost efficiency.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#primaryimage\",\"url\":\"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2024\/06\/bener-dam-banner.png\",\"contentUrl\":\"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2024\/06\/bener-dam-banner.png\",\"width\":1530,\"height\":530},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.maccaferri.com\/id\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Application of MSE Wall with Back-to-Back System for Construction of Access Road at Bener Dam\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.maccaferri.com\/id\/#website\",\"url\":\"https:\/\/www.maccaferri.com\/id\/\",\"name\":\"Maccaferri Indonesia\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.maccaferri.com\/id\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.maccaferri.com\/id\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.maccaferri.com\/id\/#organization\",\"name\":\"Maccaferri Indonesia\",\"url\":\"https:\/\/www.maccaferri.com\/id\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.maccaferri.com\/id\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2022\/07\/logo-maccaferri.png\",\"contentUrl\":\"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2022\/07\/logo-maccaferri.png\",\"width\":152,\"height\":32,\"caption\":\"Maccaferri Indonesia\"},\"image\":{\"@id\":\"https:\/\/www.maccaferri.com\/id\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.maccaferri.com\/id\/#\/schema\/person\/1d5e5211ed9f95f96dead42ad7a8265a\",\"name\":\"Yulia Novrina\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.maccaferri.com\/id\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/94f8ada620ec17951084ca30ac7b4d56e341bd24e2e47e63dfb6ff81a2c22768?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/94f8ada620ec17951084ca30ac7b4d56e341bd24e2e47e63dfb6ff81a2c22768?s=96&d=mm&r=g\",\"caption\":\"Yulia Novrina\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Application of MSE Wall with Back-to-Back System for Construction of Access Road at Bener Dam","description":"Bener Dam in Purworejo, Central Java, is a strategic project for irrigation, flood control, and raw water. Construction of access roads using back-to-back MSE Wall solutions for stability and cost efficiency.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/","og_locale":"en_US","og_type":"article","og_title":"Application of MSE Wall with Back-to-Back System for Construction of Access Road at Bener Dam","og_description":"Bener Dam in Purworejo, Central Java, is a strategic project for irrigation, flood control, and raw water. Construction of access roads using back-to-back MSE Wall solutions for stability and cost efficiency.","og_url":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/","og_site_name":"Maccaferri Indonesia","article_published_time":"2024-06-19T07:47:58+00:00","article_modified_time":"2024-06-19T07:48:04+00:00","og_image":[{"width":1024,"height":355,"url":"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2024\/06\/bener-dam-banner-1024x355.png","type":"image\/png"}],"author":"Yulia Novrina","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Yulia Novrina","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#article","isPartOf":{"@id":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/"},"author":{"name":"Yulia Novrina","@id":"https:\/\/www.maccaferri.com\/id\/#\/schema\/person\/1d5e5211ed9f95f96dead42ad7a8265a"},"headline":"Application of MSE Wall with Back-to-Back System for Construction of Access Road at Bener Dam","datePublished":"2024-06-19T07:47:58+00:00","dateModified":"2024-06-19T07:48:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/"},"wordCount":430,"publisher":{"@id":"https:\/\/www.maccaferri.com\/id\/#organization"},"image":{"@id":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2024\/06\/bener-dam-banner.png","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/","url":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/","name":"Application of MSE Wall with Back-to-Back System for Construction of Access Road at Bener Dam","isPartOf":{"@id":"https:\/\/www.maccaferri.com\/id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#primaryimage"},"image":{"@id":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2024\/06\/bener-dam-banner.png","datePublished":"2024-06-19T07:47:58+00:00","dateModified":"2024-06-19T07:48:04+00:00","description":"Bener Dam in Purworejo, Central Java, is a strategic project for irrigation, flood control, and raw water. Construction of access roads using back-to-back MSE Wall solutions for stability and cost efficiency.","breadcrumb":{"@id":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#primaryimage","url":"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2024\/06\/bener-dam-banner.png","contentUrl":"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2024\/06\/bener-dam-banner.png","width":1530,"height":530},{"@type":"BreadcrumbList","@id":"https:\/\/www.maccaferri.com\/id\/news\/application-of-mse-wall-with-back-to-back-system-for-construction-of-access-road-at-bener-dam-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.maccaferri.com\/id\/"},{"@type":"ListItem","position":2,"name":"Application of MSE Wall with Back-to-Back System for Construction of Access Road at Bener Dam"}]},{"@type":"WebSite","@id":"https:\/\/www.maccaferri.com\/id\/#website","url":"https:\/\/www.maccaferri.com\/id\/","name":"Maccaferri Indonesia","description":"","publisher":{"@id":"https:\/\/www.maccaferri.com\/id\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.maccaferri.com\/id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.maccaferri.com\/id\/#organization","name":"Maccaferri Indonesia","url":"https:\/\/www.maccaferri.com\/id\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.maccaferri.com\/id\/#\/schema\/logo\/image\/","url":"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2022\/07\/logo-maccaferri.png","contentUrl":"https:\/\/www.maccaferri.com\/id\/wp-content\/uploads\/2022\/07\/logo-maccaferri.png","width":152,"height":32,"caption":"Maccaferri Indonesia"},"image":{"@id":"https:\/\/www.maccaferri.com\/id\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.maccaferri.com\/id\/#\/schema\/person\/1d5e5211ed9f95f96dead42ad7a8265a","name":"Yulia Novrina","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.maccaferri.com\/id\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/94f8ada620ec17951084ca30ac7b4d56e341bd24e2e47e63dfb6ff81a2c22768?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/94f8ada620ec17951084ca30ac7b4d56e341bd24e2e47e63dfb6ff81a2c22768?s=96&d=mm&r=g","caption":"Yulia Novrina"}}]}},"_links":{"self":[{"href":"https:\/\/www.maccaferri.com\/id\/wp-json\/wp\/v2\/posts\/83815","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.maccaferri.com\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.maccaferri.com\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.maccaferri.com\/id\/wp-json\/wp\/v2\/users\/10872"}],"replies":[{"embeddable":true,"href":"https:\/\/www.maccaferri.com\/id\/wp-json\/wp\/v2\/comments?post=83815"}],"version-history":[{"count":1,"href":"https:\/\/www.maccaferri.com\/id\/wp-json\/wp\/v2\/posts\/83815\/revisions"}],"predecessor-version":[{"id":83821,"href":"https:\/\/www.maccaferri.com\/id\/wp-json\/wp\/v2\/posts\/83815\/revisions\/83821"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.maccaferri.com\/id\/wp-json\/wp\/v2\/media\/83824"}],"wp:attachment":[{"href":"https:\/\/www.maccaferri.com\/id\/wp-json\/wp\/v2\/media?parent=83815"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.maccaferri.com\/id\/wp-json\/wp\/v2\/categories?post=83815"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.maccaferri.com\/id\/wp-json\/wp\/v2\/tags?post=83815"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}