
Maccaferri was subcontracted for design and installation supervision assistance for the necessary protection with ACBM technology for a 4 km long and 3 meter diameter underwater pipe for a Water intake Project for an Oil & Gas project in Abu Dhabi, UAE.
Maccaferri Technical Solution was selected due to our worldwide experience and knowledge in underwater pipeline protection.
In this project mattresses of ranging 6 meters to 12 meters long were used for the stability and full protection of the underwater pipe.